and wall, to extend 30m to 2m high with all mortar colour
matched in with the existing building.
To
achieve an ideal match for the coping stones, a trial limestone
composite mix was made and cast and the compared to the original.
Once the right mix was achieved the new coping stones were
cast, allowed to dry naturally and then bedded to the wall.
Affect
plants and trees were then replanted, with all air-conditioning,
electrical and fencing secured back to the wall from their
temporary positions.
|